We were able to take the skip (a specialized waste container that holds construction debris) down because two out of the three elevators in the hotel are now up and running. Now that the skip has come down the paneling on the north side of the building will be finished and the upper floors of the building will be completely enclosed shortly after. Below are several photos that capture this phase:
