What A View #sitevisitfriday

Today when we walked the property we decided since it was sunny out to show you the views from the hotel and wow are they beautiful.  In addition as you saw from last week, our walk had pictures of the lower back section of the hotel skin that was installed.  In keeping the project moving along we had new siding for the front of the building delivered.  It was a quick #sitevisitfriday but I can tell you the project is coming along very well.    We will start diving into branding and marketing more in the coming posts so stay tuned.

Have a safe and happy St. Patrick’s Day this weekend.

Front Framing Godfrey HotelFront of the building has been framed for siding.

New Siding Delivery Godfrey HotelNew siding delivery this week

On to the views….

North View N LaSalle Godfrey HotelNorth view looking up N LaSalle Street

W View Godfrey HotelW / NW Facing View

SW View Godfrey HotelW / SW Facing View

S View Godfrey HotelSouth view looking down N LaSalle Street

SE View Godfrey HotelS / SE Facing View

NE View Godfrey HotelNE Facing View

Fun In The Sun #sitevisitfriday

Office View 3_8_13 godfrey hotel

The sun was out for our #sitevisitfriday tour, we noticed some cool things taking place and want to share then with you.  The back side of the lower section of the hotel skin is up and complete.  Stay tuned for more outside skin being applied soon!

southern lower wall 3_8_13 godfrey hotel

After the skin was complete a little testing took place, in the video you can see water testing on the seams for leaks.

As if we were in London and you hear “Mind The Gap”.  On the construction site with the core drilling and holes being make it is “Mind The Holes”.  The team does a great job letting us know where there are holes.

mind the hole godfrey hotel

A great future guest room floor corridor.

guest room corridor 3_8_13 godfrey hotel

Graciously sized guest rooms. It expands to the right where you cannot see at the moment.

guest room shot 3_8_13 godfrey hotel

The old construction site sat for a long time so we needed to remove all the old fire proofing on the building and apply new.  Remember, safety is key.

fire proofing godfrey hotel

From all that core drilling, the valves for the plumbing are waiting patiently to be installed in each room.

waiting in line godfrey hotel

Have a great weekend and thanks for reading!

Drill Baby Drill

The end of the week, Friday, we meet again and that means we walk the hotel construction site for #sitevisitfriday.  I wanted to take you back in the construction phase and explain a big factor in our build.  As you know the original construction of the building was years and years ago, we decided to make upgrades to the building to meet the needs of the hotel.  Step one to start those upgrades was to level every floor by pouring a new concrete floor.  Step two to this phase was then to core every floor for plumbing, electrical, etc… which is what we saw taking place today. This process has been completed on lower floors and they are now moving up floor by floor.

Before and After Of Concrete Pouring

Before Concrete Pouring Godfrey Hotel

After Concrete Pouring Godfrey Hotel

This process was very labor intensive and took some time to complete.  You probably saw truck after truck coming to the construction site for a few weeks earlier this year.

Concrete Trucks Godfrey Hotel

The team then took the concrete wheel borrow by wheel borrow up to each floor as a team poured it and leveled each floor.

Concrete Floor Leveling Godfrey Hotel

Concrete Pouring Godfrey Hotel

After each floor dried and settled over a period of time the coring began for all the piping to be placed in the hotel.  These are heavy powerful drills with incredible drill bits to cut these holes in the concrete.  The drill bits for coring ranged in size from 6 inches to over 1 foot.

Core Examples Godfrey Hotel

Here is the result from the drilling, these are called the cores.

Concrete Cores Godfrey Hotel

The end result with plumbing installed.

Core Plumbing Godfrey Hotel

Now to do this for each of our 221 guest rooms in the hotel, so now it is time to drill baby drill.

The Exterior. Up She Goes.

Well it is Friday and we wanted to show you the exterior. Cold, wind, snow, rain, it doesn’t stop LendLease our construction company from moving forward.  When we had some beautiful sun the past couple days before this last snow storm, the new exterior skin was being applied to the building.  This is a very difficult project as the entire outside is placed on the building like a puzzle.  We are excited to see it go up over the next several weeks and give the building that distinct architectural look it was meant to have.

The entire process of building a hotel and brand is sectioned out into phases.  Each phase has its scope of work and what is to be completed and when.  It may seem like you are jumping around but in the big picture these phases are all related to each other and have to be completed in order.

Architectural Design Godfrey Hotel Chicago

South side exterior Godfrey Hotel